segunda-feira, 29 de junho de 2009

Estrutura do Leme

This is the basic lay out for the rudder structure.

This is what I've cut and prepared today for gluing. Tomorrow I will still give that piece of solid wood some better shaping. And then I'll drench that thing in epoxi.
First cut were 2 pieces of 10mm plywood, to back up the hull bottom and strengthen the backbone (keel). This is still backed up with a second layer of 10mm ply.

Nenhum comentário: