
Luiz Fernando is again stuck with back problems. He has pain in his back, and is going to see the doctor. Since Monday is a holiday in Brazil, we agreed that I will drive out to Itaipú on Monday morning. He reports that the construction has advanced as planned this week, despite his health issues.
I will use the day to think more about the rig configuration. I will try to use the free time productively, and detail the configuration. I'm pretty well decided on a Wharram rig option. It is a simple set up, that uses only little hardware, thus keeping cost low. Also the sail cut is easy, which should decrease production cost. The short gaff keeps the center of effort low. The mast can be homemade out of wood. It is buoyant which is high on my whish list. And I find it visually attractive.
I think it will fit nicely on Arpex. What I need now, is to define the exact location of the mast step, supporting structure, geometry (CE vs. CLR). The CE of the rig that I will design will have to meet the designed CE. This should not be too hard to achieve. Let's go to work.
This is the scheme of a "modified Wharram Rig". I found it on the Harryproa Yahoo Group page (http://au.groups.yahoo.com/group/harryproa/). I don't know who posted it. But it seemed interesting to me. I ask myself if it is possible to include buoyancy where the sail goes over the short gaff. That would be a nice feature. 





















